Liverpool to Leeds was meant to be electrified and the lines upgraded
Not happening
The fastest train to Manchester from Liverpool takes an hour, its 35 miles. LOndon takes just over 2 hours its 200 miles away
Jesus don't attempt it from Southport whatever you do, you'll travel through the land that time forgot, that line even still has semaphore signals. One Sunday I set off from Formby 5 hours before kick off in Blackburn (which would take me 45 mins in a car). I just about had time for a pint with @blandy before the game and I went by train because I wanted a drink. That journey required 4 changes including an hour wait in Bolton and a train from Bolton to Blackburn that seemed to be pulled by a single donkey
It isn't just Wales that has these projects not happen.
There are also simple cheap projects that should happen but never do
Burscough has two friggin stations, two, its a very small town. It has two stations because it has an East / West line (Southport to Wigan and beyond) and a North South Line (Ormskirk to Preston) To get from Burscough to Preston, is two trains with a mile walk between the two burscough stations because those lines don't meet, the E/W one goes over the N/S one but get this, they used to meet until Beeching. Beeching axed the connection, the Burscough Curves. They just need to do a bit of remedial work and lay track / signalling, in the grand scheme of things, its pennies. The embankments are still there. SOuthport has a station with tons of platforms but only runs services out on two lines. Its infuriatingly stupid
But none of that means that HS2 is a bad idea either